In September 2005 the children helped make the bricks and build the walls.
Iron sheeting was laid in place on the roof.
Then the students leveled the floor to start using the building in September, when the pupils returned.
Inside the new classroom on 15th September 2005.
Form Four students with their teacher at the blackboard.
The brick walls are not yet plastered.
Form Five Advanced ("A") level students in their new classroom.
No comments:
Post a Comment